DIS
The 98,800 SF facility consists of concrete tilt panels, structural steel and paneled roof system. DIS was a fast track, design assist project utilizing Southland Industries, and IES for the mechanical, plumbing and electrical design build. The project’s location in the Tahoe-Reno Industrial Center allowed the project to be broken up into multiple permits for grading, slab/foundation, shell and tenant improvements. Having the permits split up gave us the ability to start construction on the site while the building was still under design. The main manufacturing area was completed and turned over for installation of equipment and materials while the office was being completed.
The 20,000 SF of Tenant Improvements which, completed in January 2017, included stained and polished concrete, decorative steel and glass stairs cases, vaulted ceiling entry ways, large conference rooms(2) complete with video conference capabilities, training rooms, custom built sliding conference room doors, locker rooms and showers, future expansion areas for a work- out room and a Quality Control lab.
As the General Contractor, Miles Construction was responsible for the design and construction process, including the design team selection, permitting, constructability analysis, value engineering, budgeting, scheduling, contract negotiation and execution, change order resolution, and the completion of the construction and close-out processes.